Project spotlight.
Take a closer look at a few standout projects that showcase the scale, skill, and craftsmanship behind our work.
1400 W 3rd St.
An infill industrial project near downtown with flexible warehouse and commercial space. Concrete work included 9-inch tilt-up panels, 7-inch slabs-on-grade, 3.5-inch topping slabs over metal deck, and cast-in-place dock walls.
- Year
- 2025
- Location
- Tempe, AZ
- Status
- Completed
- Scope
- Tilt-up · Flatwork · Industrial Floors
Mercy Gilbert Medical Center 3.
A medical office expansion next to Mercy Gilbert Medical Center with clinical spaces and supporting plumbing and data infrastructure. Concrete work included tilt-up panels, 5-inch slabs-on-grade, 2.5-inch topping slabs over metal deck, and cast-in-place walls.
- Year
- 2022
- Location
- Gilbert, AZ
- Status
- Completed
- Scope
- Flatwork · Tilt-up
AKOS Medical Office Building.
A Medical Office Building (MOB) housing AKOS Urgent Care and telehealth administrative suites in Avondale. Concrete work included tilt-up panels that grew thicker from level-to-level, an elaborate formliner pattern, 4-inch slab-on-grade, elevated concrete slabs, and concrete paving.
- Year
- 2018
- Location
- Avondale, AZ
- Status
- Completed
- Scope
- Elevated slab · Tilt-up · Flatwork
Musical Instrument Museum.
A 190,000-square-foot, two-story museum in north Phoenix. Concrete work included reinforced structural elements and curved courtyard walls with a smooth exposed finish.
- Year
- 2009
- Location
- Phoenix, AZ
- Status
- Completed
- Scope
- Cast-in-place · Elevated slab
Gilbert & Vaughn Whiskey Row.
Dierks Bentley's Whiskey Row is a restaurant and entertainment venue in Gilbert's Heritage District. Concrete work included 4- and 5-inch slabs-on-grade and elevated concrete slabs.
- Year
- 2016
- Location
- Gilbert, AZ
- Status
- Completed
Crimson Canyon.
This tilt-up project features 9.5-inch reinforced panels, a 7-inch interior slab-on-grade, foundations, panel erection, and related site concrete.
- Year
- 2022
- Location
- Buckeye, AZ
- Status
- Completed
- Scope
- Tilt-up
PHX 13 Data Center.
PHX13 Data Center is one of Riggs's most technically demanding projects — a mission-critical facility where structural integrity and construction precision are non-negotiable. Cast-in-place concrete construction was specified throughout to meet the seismic performance, vibration isolation, and load
- Year
- 2023
- Location
- Goodyear, AZ
- Status
- Completed
- Scope
- Cast-in-place · Flatwork
Nexus Commerce Center (Elliot & Hardy Industrial).
Nexus Commerce Center is a three-building, 273,000-square-foot industrial development at Elliot Road and Hardy Drive in Tempe. The project used tilt-up concrete construction.
- Year
- 2025
- Location
- Tempe, AZ
- Status
- In Progress
- Scope
- Tilt-up · Flatwork
Fender.
Riggs delivered the concrete scope for Fender Musical Instruments Corp.'s new 80,000-square-foot, three-story corporate co-headquarters at RED Development's PV redevelopment of the former Paradise Valley Mall in Phoenix. The building houses design and modeling shops for guitar and amplifier
- Year
- 2024
- Location
- Phoenix, AZ
- Status
- In Progress
- Scope
- Tilt-up · Elevated slab · Flatwork