1 / 2
2025
An industrial assembly and fabrication facility with production space, heavy electrical service, and ventilation systems. Concrete work included 7.25-inch tilt-up panels, 6-inch slabs-on-grade, 3.5-inch topping slabs over metal deck, and dock ramp walls.
Year
2025
Location
16741 W Northern Ave
Litchfield, AZ 85340
Industry
Industrial
Scope
Tilt-up · Industrial Floors
Status
In Progress
Start working with Riggs today



