1 / 4
2022
Phase 2 of North Valley Industrial Park, with 32-foot clear heights, dock-high loading, and warehouse space. Concrete work included 9.5- and 12-inch tilt-up panels, 6-inch slabs-on-grade, dock ramp walls, and concrete paving.
Year
2022
Location
440 and 500 E Pinnacle Peak Rd
Phoenix, AZ 85027
Industry
Industrial
Scope
Tilt-up · Industrial Floors
Status
Completed
Project Photos



Start working with Riggs today


