1 / 3
2025
One of the mission critical buildings within the PHX 01 campus in Avondale, built as part of a multi-building data center development. Concrete work included 6- and 16-inch slabs-on-grade, 4- and 4.5-inch topping slabs over metal deck, spread and continuous footings, and cast-in-place dock walls.
Year
2025
Location
3700 S Avondale Blvd
Avondale, AZ 85353
Industry
Mission Critical (Data Center)
Scope
Cast-in-place · Flatwork
Status
In Progress
Project Photos


Start working with Riggs today


